Previous Topic

Next Topic

Book Contents

Book Index

Adding Well Completion Details

Next, well completion details will be added to the borehole log. The well completion details consist of the following:

Before entering the well completion details, the start depth of the borehole needs to be adjusted to allow for the aboveground cover. To change the start depth, click on the depth column with the left mouse button. Enter the Start Depth as –2 feet.

To enter the well completion details, click on the well column with the left mouse button. The Layout tab of the Well Data form below will be displayed. Enter the layout information shown on the tab.

Click on the Components tab at the top of the form and enter the well components shown below. When selecting the symbol for the bottom seal, specify the Horizontal Border as “Bottom”. When selecting the symbol for the sand packing, specify the Horizontal Border as “Top”. And when selecting the symbol for the lower bentonite seal, specify the Horizontal Border as “None”.

The water level measured can be entered by clicking on the Water Levels tab. Enter the water level information shown on the tab below.

Next, the annotations for the well can be added by clicking on the Annotations tab. For this tutorial, enter the information shown on the tab on the next page.

See Also

Creating a Borehole Log

Creating a New Project

Creating a New Borehole Log

Adding General Borehole Data

Adding the Borehole Depth

Adding the Lithology

Adding Sample Data

Adding Graph Data

Saving the Borehole Log

Printing the Borehole Log

Copying the Borehole Log