Stations can be added, edited and deleted from a project. There is no limit to the number of stations a project can contain. There should only be one station at each physical location within a project.

 

There are two methods for adding a station, these are:

 

1.Entering the station data directly in GaeaSynergy.

2.Automatic importation from EDMS Field.

 

The first method is discussed in the following sections, and the last is discussed below.

 

Click for online tutorial

 

EDMS Field

 

When a station is received from EDMS Field it will automatically be imported into EDMS and associated with a task if possible. If the station does not specify a proper task it will still be imported, but will not be associated with a task. This association can later be performed manually using the link feature as described on the Stations and Samples tab for a task. If the station received from EDMS Field does not contain a valid station it will not be imported and the station file will be placed in the errors folder in the datastore, "Datastore\EDMS\Stations\Errors". This file can then be examined to determine why it can not be imported into EDMS.

 